Note: All times listed in EST.
Preview
|
1:00 PM - 5:00 PM
|
BW |
Achieving Excellence in Bridge Welding Design
|
3.50 |
Preview
|
1:10 PM - 2:00 PM
|
SS1 |
Welcome and SS1 - Z Purlins
|
1.00 |
Preview
|
2:00 PM - 3:00 PM
|
SS2 |
Non-Steel Members
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
SS3 |
CFS Columns
|
1.00 |
Preview
|
4:00 PM - 4:50 PM
|
SS4 |
Members (Stainless)
|
1.00 |
Preview
|
5:00 PM - 6:00 PM
|
|
SSRC Annual Business Meeting and Vinnakota Award Presentation
|
|
Preview
|
6:00 PM - 6:25 PM
|
|
SSRC Task Group Overview
|
|
Preview
|
6:30 PM - 7:00 PM
|
|
SSRC MAJR Award Presentation
|
|
Preview
|
7:00 PM - 8:00 PM
|
|
SSRC Social Hour
|
|
Preview
|
8:00 AM - 10:00 AM
|
K1 |
Keynote Address and Awards Ceremony
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
A1 |
200 Park: A Case Study in Structural + Skin Innovation
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
B1 |
Making a Single Coat of Inorganic Zinc the Sole Corrosion Protection System a Reality for Steel Bridges
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
B14 |
Bridge Geometry - From Theory To Reality
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
C1 |
Watch Out for Unevenly Loaded Welded Connections
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
D1 |
Proposal Writing and the NISD Industry Standard
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
EW24 |
Whoa, Autodesk does that?! (the Structural Steel edition.)
|
|
Preview
|
10:15 AM - 11:15 AM
|
EW9 |
Non-Destructive Testing Methods (Phased Array, Mag Particle, UT)
|
|
Preview
|
10:15 AM - 11:15 AM
|
F1 |
Developing a Safety Strategy or How a Safety Plan is Born
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
M1 |
What's New in AISC 358-22
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
N2 |
Steel-Framed Floor Design for Vibration-Sensitive Equipment
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
N21 |
Stability of trusses during erection
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
N34 |
A Proven Track Record: In-Wall Beam Design for Dormitories
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
N37 |
A913 - High Strength Welding Considerations
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
Q1 |
Certification Forum
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
R3 |
Coordination Issues with Roof and Floor Penetrations
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
S1 |
Members (Steel)
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
Y10 |
Queen Posts Strengthen Queen City: Charlotte Convention Center Expansion
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
Z1 |
10 Lessons in Project Management we didn't learn in school...
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
Z14 |
Navigating Contracts as a Steel Fabricator & Erector for Maximum Profitability
|
1.00 |
Preview
|
10:15 AM - 11:15 AM
|
Z21 |
Leading an Organization In a Fast Changing Business and Workforce Environment
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
A2 |
2023 Forge Prize: An Encore Presentation from the Recipients of the 2023 Forge Prize
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
B15 |
Deck It with Steel
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
B2 |
Heat Straightening and Cold Forming - Steel Can Do It
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
C2 |
Steel Castings - A New Tool in the SEOR's Toolbox
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
D2 |
Panel Discussion - Steel Detailing and Delegated Design
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
EW16 |
Autonomous Welding – Seat back, relax, have a coffee. Trouble free robotic welding.
|
|
Preview
|
11:30 AM - 12:30 PM
|
EW23 |
Designing Steel Connections without Drilling or Welding
|
|
Preview
|
11:30 AM - 12:30 PM
|
F2 |
Shining Light on Mental Health and Suicide Prevention in Construction
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
M14 |
Connection Design Responsibility and Completeness of Contract Documents – What's New and What's Changed in the AISC Specification and the AISC Code of Standard Practice
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
N1 |
SpeedCore Systems: Latest Developments
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
N22 |
Properly Specifying Steel Deck
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
N35 |
Tower Cranes: Understanding their Behavior and Incorporating Their Effects on Buildings During Construction
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
N40 |
Fail Forward
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
Q14 |
How to Incorporate Risk-Based Thinking Into the Everyday
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
Q2 |
AISC Certification What does it Mean?
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
R11 |
Common Rigging Mistakes
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
S2 |
Members (Steel) and TG02 Meeting
|
1.00 |
Preview
|
11:30 AM - 1:30 PM
|
U1 |
Educator Session: AISC Programs for Faculty
|
2.00 |
Preview
|
11:30 AM - 12:30 PM
|
Y1 |
AESS and Fire Considerations: UIUC Instructional Facility for the College of Engineering
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
Z15 |
Structural Steel: An Industry Overview and Economic Forecast
|
1.00 |
Preview
|
11:30 AM - 12:30 PM
|
Z2 |
Advanced Welding Technology and Industry 4.0
|
1.00 |
Preview
|
12:00 PM - 2:00 PM
|
|
Lunch
|
|
Preview
|
1:45 PM - 2:45 PM
|
A3 |
Kinetic Design: Hyper-collaboration and The Shed at Hudson Yards
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
B16 |
Design Optimization for Steel Bridge Girders and Bolted Connections
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
B3 |
T1 Steel: What You Need to Know from the FHWA and State Perspectives
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
C3 |
Make or Break Details
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
D3 |
Steel detailing challenges and Opportunities with the Design Build/BIM Projects
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
EW3 |
Avoid wasting time during connection design
|
|
Preview
|
1:45 PM - 2:45 PM
|
EW4 |
Do More with Your Model: Software Innovations to Save Time in the Office and Shop
|
|
Preview
|
1:45 PM - 2:45 PM
|
F3 |
Safety, machine guarding, and LOTO in an automated shop environment
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
M2 |
Updated Loading Standard on Structures – Part 1 - Snow
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N23 |
Properly Specifying Steel Joists and Joist Girders
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N26 |
Steel Diaphragm Innovation Initiative: Seismic Behavior of Composite Concrete-filled Steel Deck Diaphragms
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N3 |
Efficient Design of Trusses Guided by Design Diagrams
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N36 |
Moment Frames (From 3 to 8)
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Q15 |
Calibration – Why, What, and When
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Q3 |
AISC 360 Chapter N and AISC 341 Chapter J; The Specifications and The Provisions, How They Work Together and What You Need to Know!
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
R4 |
Lifting Devices in Steel Construction
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
R5 |
Scheduling for Success in your Shop
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
S3 |
Thin Non-CFS
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Z16 |
The Anatomy and Psychology of Difficult Negotiations
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Z3 |
Building a Culture that Builds PEOPLE
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
A4 |
Modular Construction Montage: Exploring The Successes of Steel in Modular Design & Construction
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
B17 |
Extending the Service Life of Steel Bridges – Rehab/Retrofit 1
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
B4 |
Railroad Bridges - A Contractor, Fabricator, and Designer's Perspective
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
C4 |
Simple Connections Simplified - Joist and Deck Style
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
D4 |
Successful Steel Detailing Project Management
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
EW19 |
Accelerated Steel Procurement (ASP)
|
|
Preview
|
3:00 PM - 4:00 PM
|
EW6 |
Use of Consteel to Facilitate Steel Design
|
|
Preview
|
3:00 PM - 4:00 PM
|
F6 |
Protecting Your Company's Bottom Line Through Safety
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
M3 |
Updated Loading Standard on Structures – Part 2 - Temporary Structures
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
M4 |
End-Plate Moment Connection Design Using the New AISC Design Guide 39
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
N25 |
Stability Matters: What Can Happen When Analysis, Design, Detailing and Fabrication Differ
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
N4 |
It is Better to Bend than Break: Retrofitting with Buckling Restrained Braces and Steel
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Q16 |
Nuts, Washers and Bolts, Oh My!
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Q4 |
The Hidden Shop - Nonconformances and Corrective Actions (Part 1)
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
R13 |
Effective Project Management 1 - Job Setup and Preplanning
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
S4 |
CFS
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Z17 |
Investing in your own Skilled Trades Pipeline: Private + Public Investment Success
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Z4 |
Business Development Moving Forward: Proactive Practices for a Post-Covid World
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Z7 |
Ethical Behavior of Ethical Engineers
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
EW12 |
Use It To Tube It: 6 STI HSS Design Tools and How to Use Them
|
|
Preview
|
4:45 PM - 5:45 PM
|
A5 |
The Power of the Diversity, Equity, & Inclusion Lens
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
B18 |
New Applications in Steel Bridge Redundancy
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
B5 |
Railroad Steel Bridge Design and Repair
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
D5 |
Using Point Cloud Models in Steel Detailing
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
F5 |
OSHA Reporting and Recordkeeping
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
M12 |
The New Code of Standard Practice
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
M5 |
Speeding Up Design with Stainless Steel
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
N24 |
Current Views from Past Higgins Award Winners: Gussets, Connections, and Stress-Distribution Models
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
N38 |
Why to Design Steel Parking Structures
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
N5 |
Practical Design of Block Out Connections at the Base of Steel Moment Frames
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Q17 |
Welding management for your shop and jobsite
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Q5 |
The Learning Shop – Effective Use and Management of Nonconformances and Corrective Actions (Part 2)
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
R14 |
Effective Project Management 2 - How to Achieve Great Project Closeout
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
S5 |
CFS and TG05 Meeting
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Y2 |
Challenges Erecting A New Level Atop an Existing Convention Center
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Z18 |
Working with your GC Using the Code of Standard Practice as the Guide
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Z19 |
Combating Steel Price Fluctuations Using the Futures Market
|
1.00 |
Preview
|
4:45 PM - 5:45 PM
|
Z5 |
Can I Say That? The Ethics of Negotiation
|
1.00 |
Preview
|
5:30 PM - 7:00 PM
|
|
Welcome Reception
|
|
Preview
|
7:00 AM - 7:45 AM
|
EW5 |
Getting the Most Out of Your RISA Software
|
|
Preview
|
8:00 AM - 9:30 AM
|
K2 |
Design Steel Your Way
|
1.50 |
Preview
|
9:30 AM - 11:00 AM
|
|
Coffee Break
|
|
Preview
|
9:45 AM - 10:45 AM
|
A6 |
Totally Expressive: Taking AESS to the Limits through Force Differentiated Structures
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
B19 |
Steel Properties Influenced by the Steelmaking Process
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
B6 |
Erection Engineering and Strategies for Challenging Site Conditions
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
C5 |
Case Studies on Structural Stability Failures: You Make the Call
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
C6 |
Common Mistakes Made By New Connection Designers
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
D6 |
Why NISD IDC Certification - what behaviors to look for when using a certified steel detailer.
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
EW1 |
Accurate steel project analysis and design as well as shop drawings made easy
|
|
Preview
|
9:45 AM - 10:45 AM
|
F4 |
Industrial Hygiene
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
G1 |
Everything you need to know about Buy Clean Laws and EPDs
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
M6 |
Seismic Retrofit Techniques for Steel MFs Using AISC 342
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
N28 |
Stay in your lane: EOR's and Testing Agencies
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
N6 |
Where's Waldo? - Finding vertical and horizontal seismic structural irregularities and designing for them.
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
Q18 |
A QMS Isn't A Burden - It's A Benefit
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
Q6 |
Join the Race for 2023 and Beyond: Technology Integration for Today's Erector
|
1.00 |
Preview
|
9:45 AM - 11:45 AM
|
R10 |
Fabricator Roundtable/Steel Wins in More Ways Than One
|
2.00 |
Preview
|
9:45 AM - 10:45 AM
|
S6 |
Systems
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
T1 |
Emerging Welding Technology
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
Y3 |
Hudson's Site Concrete Filled Tube Columns - Early Design to Construction
|
1.00 |
Preview
|
9:45 AM - 10:45 AM
|
Z10 |
How to Sell Successfully in Today's Construction World Part 1
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
B20 |
New Design Strategies to Make Steel Bridges Resilient to Extreme Events
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
B7 |
Extending the Life of Steel Structures Using Advanced Analysis - Rehab/Retrofit 2
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
C7 |
Designing Connections Beyond the Manual
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
D7 |
Best Practices when Detailing and Designing with Steel Joists
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
EW15 |
Project Management through Steelweb Platform
|
|
Preview
|
11:00 AM - 12:00 PM
|
EW17 |
Practical resilience in structural analysis and design with RAM, STAAD & ADINA
|
|
Preview
|
11:00 AM - 12:00 PM
|
F7 |
Schedule vs Safety
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
G2 |
Designing for Sustainability
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
M7 |
The AISC Code of Standard Practice: Alternate Delivery Methods
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
N29 |
Structural Steel Inspection Process: From Certification to Steel Erection
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
N39 |
Steel Castings in Commercial Projects – Applications and Lessons Learned
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
N7 |
Are your Design Documents Effectively Communicating Your Intent?
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
Q19 |
Contractor QC Training and Task Management Tips and Traps
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
S7 |
Systems and TG03 Meeting
|
1.00 |
Preview
|
11:00 AM - 2:30 PM
|
SCIS |
Students Connecting with Industry Sessions
|
|
Preview
|
11:00 AM - 12:00 PM
|
T2 |
Laser Scanning and Steel
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
Y5 |
New JPMorgan Chase NYC Headquarters
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
Z11 |
How to Sell Successfully in Today's Construction World Part 2
|
1.00 |
Preview
|
11:00 AM - 12:00 PM
|
Z8 |
Ethical Perspectives and Decisions
|
1.00 |
Preview
|
12:00 PM - 2:00 PM
|
|
Lunch
|
|
Preview
|
1:45 PM - 2:45 PM
|
A12 |
Irregular Development
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
A8 |
Architectural Detailing with Intumescent Coatings
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
B21 |
What's New in Steel Bridge Fastening Systems
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
B8 |
Everything You Need To Know About Fabrication Tolerances
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
C8 |
Connection Design using Advanced FEA - Why When & How
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
D8 |
Best practices when selecting and detailing Steel Deck
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
EW11 |
Why Structural Engineers Love Bluebeam: Optimizing Efficiency and Productivity
|
|
Preview
|
1:45 PM - 2:45 PM
|
EW21 |
THE GREAT SOLUTION for Steel's Labor Shortage and Onsite Training
|
|
Preview
|
1:45 PM - 2:45 PM
|
F8 |
Unlock the Mysteries of OSHA's Lockout/Tagout Standard
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
G3 |
Cradle to Cradle: Life Cycle of Steel
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
L1 |
Claims Erectors can Assert for Delays or Disruptions
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
M8 |
Overview of the 16th Ed. Steel Construction Manual
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N15 |
Milek Project: Critical temperature relationships for performance-based design of steel composite floor assemblies to achieve standard fire resistance and natural fire robustness
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N27 |
Torsion Design Fundamentals
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
N8 |
Challenges for Designers of Crane-Supporting Steel Structures
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Q20 |
Forging Employee Loyalty: Recruiting and Retention
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Q8 |
Entering the Transportation Sector: Strategies for Successful Market Entry and Managing Risk
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
S8 |
Extreme Fire
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
T3 |
Block Chain applications for Construction
|
1.00 |
Preview
|
1:45 PM - 2:45 PM
|
Z13 |
Knowledge Through the Profession: Advice Every Engineer Needs
|
1.00 |
Preview
|
3:00 PM - 4:30 PM
|
|
Coffee Break
|
|
Preview
|
3:00 PM - 4:00 PM
|
A9 |
Extreme Steel Bending
|
1.00 |
Preview
|
3:00 PM - 5:00 PM
|
B22 |
Steel Bridge Industry Roundtable
|
2.00 |
Preview
|
3:00 PM - 4:00 PM
|
B9 |
A Tough Steel to Crack
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
C9 |
Connection Design Using Finite Element Analysis to Cut Time and Cost for General Contractors, Steel Fabricators, and Ease of Erection
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
D9 |
Integrated Services Leads to Success at the US Olympic and Paralympic Museum
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
EW10 |
How to Choose Your ISO Certification Body Efficiently
|
|
Preview
|
3:00 PM - 4:00 PM
|
EW2 |
Using Trimble Software to Build a Constructible Process from Design to Fabrication
|
|
Preview
|
3:00 PM - 4:00 PM
|
F9 |
Managing Safety as a Non-Conformance
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
G4 |
The Fabricator's Role in Sustainability
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
L2 |
Common Problems on Projects that Must be Avoided
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
N16 |
New research developments for web shear buckling in steel plate girders: Testing, analysis, and performance enhancement
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
N9 |
How to Verify SE Software
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Q21 |
Forging Employee Loyalty: Promotions and Mentorship
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Q9 |
Growing in the Transportation Sector: Navigating Advanced project requirements and Managing More Risk
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
R12 |
Working with your GC using the Code of Standard Practice as the Guide
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
S9 |
Extreme Seismic and TG06 Meeting
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
T4 |
Further Developments in AR Applications for Steel
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Y4 |
Intumescent Extremes
|
1.00 |
Preview
|
3:00 PM - 4:00 PM
|
Z20 |
Future-proofing the Steel Industry: Strategies for Developing a Tech-Savvy and Collaborative Workforce
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
A10 |
Hybrid Steel-Framed Structures with Mass Timber Floors
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
A13 |
Structural Enablers:
Design innovations in structural steel in the work of Diller Scofidio and Renfro
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
B10 |
Steel Keeps 'er Moving (Moveable Steel Bridges)
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
D10 |
Updates to the AISC Code of Standard Practice - What Steel Detailers need to know!
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
EW13 |
AISC 360/341 Steel Member Design in RFEM 6
|
|
Preview
|
4:15 PM - 5:15 PM
|
EW22 |
Fully Connected Steel Models: How to Mitigate Issues Early with Integrated Solutions
|
|
Preview
|
4:15 PM - 5:15 PM
|
F10 |
How to prepare for and manage an OSHA inspection
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
L3 |
Prosecution and Recovery of Shop Fabrication Costs Due to Delay or Disruption Outside the Fabricator's Control
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
M10 |
Overview of updates to the composite provisions of the AISC Specification
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
N10 |
Know Your Way Around Round HSS
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
N17 |
Connecting the Load Path: Chords and Collectors in Steel Deck Diaphragms
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
Q10 |
Three Fabricators Walk into a Bar...
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
Q22 |
It fits! - Tolerences aren't important, until it doesn't fit
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
S10 |
Beedle Presentation
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
T5 |
Model Based Estimating
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
Y7 |
Renovation of an Iconic Chicago Landmark / Tribune Tower Complex
|
1.00 |
Preview
|
4:15 PM - 5:15 PM
|
Z9 |
Getting Sustainability Right: Creating an ESG Strategy that aligns with your purpose and provides practical value to the business.
|
1.00 |
Preview
|
7:00 PM - 9:00 PM
|
|
Conference Dinner
|
|
Preview
|
7:00 AM - 7:45 AM
|
EW14 |
New! Steel Connection Design in RFEM 6
|
|
Preview
|
8:00 AM - 9:00 AM
|
A11 |
Inherent Sound Isolation Characteristics of Steel Buildings
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
B11 |
Steel Tied Arch Pedestrian Bridges Located in the Emerald Coast and Emerald City
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
B23 |
Richmond-San Rafael Bridge Gusset Plate Retrofit
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
D11 |
Tips and Tricks for Getting Paid as a Steel Detailer
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
L4 |
Top Ten Provisions in the General Contractor's Contract that you Address and Negotiate During the Bid Phase.
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
M11 |
New AISC 341-22 Design Approach for Chevron SCBFs: Design Expressions and Examples
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
M9 |
Overview of the 2022 Specification for Structural Steel Buildings
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
N11 |
More Things Your Fabricator Wishes You Knew About HSS
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
N18 |
Welding Coordination between the Engineer, Detailer and Fabricator
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
N30 |
What Every Engineer Needs to Know About Steel Deep Foundations
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
Q11 |
What you should know about complex coatings?
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
R15 |
Steel Pre-Construction Planning
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
R6 |
SEAA Project of the Year Award Winners Talk About Lessons Learned
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
S11 |
Bridge
|
1.00 |
Preview
|
8:00 AM - 9:00 AM
|
T6 |
Integrated Steel Delivery
|
1.00 |
Preview
|
9:00 AM - 11:00 AM
|
|
Coffee/Snack Break
|
|
Preview
|
9:15 AM - 10:15 AM
|
B12 |
Implementation of the New National Bridge Inspection Standards
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
B24 |
A new type of EDD using Duplex Stainless Steel for the Golden Gate Bridge Main Suspension Span
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
EW18 |
BIM for Steel Bridges: Physical and Analytical Models in a Common Data Environment
|
|
Preview
|
9:15 AM - 10:15 AM
|
EW20 |
Intuitive Structural Design with ENERCALC
|
|
Preview
|
9:15 AM - 10:15 AM
|
F11 |
OSHA and ACCSH Update
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
L5 |
Top Ten Provisions You Need to Include in Your Standard Form Subcontract.
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
N12 |
Performance based alternative for the design of shear connectors in composite beams
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
N19 |
Welding Constructability
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
N31 |
Steel Joist Tool Box Additions
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
N41 |
Structural Condition Assessment Strategies for Existing Steel Buildings
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
Q12 |
Shop Welding Fundamentals for D1.1
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
R17 |
The Importance of a Pre-Detailing Meeting
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
R7 |
What an Erector Needs to Know About Engineered Erection Plans
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
S12 |
Bridge and TG04 Meeting
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
Y12 |
Underpinning with Steel: Stories from Mega-Retrofit Projects in the San Francisco Bay Area
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
Y6 |
Successful Steel-Framed Parking Garages: A Nod to Past Performance
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
Y8 |
St. Pete Pier Market Solar Canopy
|
1.00 |
Preview
|
9:15 AM - 10:15 AM
|
Z6 |
Don't Shoot the Messenger! The Art and Science of Delivering News No One Wants to Hear
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
B13 |
Uncoated Weathering Steel - Connecticut's Experiences & New Designer Resources
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
B25 |
Additive Manufacturing of Structural Steel
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
M13 |
Seismic Retrofit Techniques for Steel CBFs Using AISC 342
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
N13 |
Steel and Fire: What's changed in 2023?
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
N14 |
60 Seismic Design Ideas in 60 Minutes
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
N20 |
Crane Runway Basics
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
N32 |
Concentrated and Non-Uniform Loading on Steel Deck
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
N33 |
Fulfillment Center Floor Design - Robots to Vibration
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
Q13 |
Right bolt, right time, right place. How to order structural bolts correctly the first time.
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
R8 |
What Fabricators Love to Hate about Erectors
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
S13 |
CFS Walls
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
Y11 |
The MSG Sphere at the Venetian
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
Y9 |
Steel Erection Case Study- 110 N Wacker, Chicago
|
1.00 |
Preview
|
10:45 AM - 11:45 AM
|
Z12 |
A holistic approach to developing a training program to teach the craft of layout and fitting
|
1.00 |
Preview
|
12:00 PM - 1:30 PM
|
K3 |
What Structural Engineers Need to Know about Corrosion
|
1.50 |